In CL 223019, I reduced the short timeout in the testLayers helper to
be even shorter than it was. That exposed a racy (time-dependent)
select later in the function, which failed in one of the slower
builders (android-386-emu).
Also streamline the test to make it easier to test with a very high -count flag:
- Run tests that sleep for shortDuration in parallel to reduce latency.
- Use shorter durations in examples to reduce test running time.
- Avoid mutating global state (in package math/rand) in testLayers.
After this change (but not before it),
'go test -run=TestLayersTimeout -count=100000 context' passes on my workstation.
Fixes#38161
Change-Id: Iaf4abe7ac308b2100d8828267cda9f4f8ae4be82
Reviewed-on: https://go-review.googlesource.com/c/go/+/226457
Reviewed-by: Ian Lance Taylor <iant@golang.org>
Though there is variation in the spelling of canceled,
cancellation is always spelled with a double l.
Reference: https://www.grammarly.com/blog/canceled-vs-cancelled/
Change-Id: I240f1a297776c8e27e74f3eca566d2bc4c856f2f
Reviewed-on: https://go-review.googlesource.com/c/go/+/170060
Run-TryBot: Josh Bleecher Snyder <josharian@gmail.com>
TryBot-Result: Gobot Gobot <gobot@golang.org>
Reviewed-by: Brad Fitzpatrick <bradfitz@golang.org>